Unidentified
water well
Site
of first water power survey
Water
power and sawmill site, Kalamazoo River, 1840's
Water
power site, first head gates
Source
of the mill race
Water
power site, Verona
Flood
at Verona water power site
Minges
Brook Mill
Dam
at Minges Brook Mill
"Race"
between Jackson and Fountain Streets
Henry
Willis' city water project
Goguac
pumping station
Early
water power site, Kendall Street
Johnson
Machine Works, built circa 1900
Burnham
Brook location of water power site
Site
of Burnham Brook water power
Water
storage at site of first water cure, St. Mary's Lake
Early
sewage systems of Battle Creek
Early
sewage systems of Battle Creek
Cement
tile laid out for building of sewer
Building
sewage system, 1934
Building
sewage system, 1934
Site
of first dam, built 1835 by Sands McCamly
Spillway
of early water-power plant
Water
mill at Hodunk, Michigan
Sewage
disposal plant, 1935
Sewer
connection, Kalamazoo River, 1936
Sewer
crossing, Angell Street, 1936
Separator,
new sewage disposal plant, 1936
Settling
tanks, new sewage disposal plant, 1936
Electric
pumps, new sewage disposal plant, 1936
New
sewage disposal plant, 1936
Verona
dam water spill
New
dam at lower mill pond, August 1938
Old
tree stumps dug up at site of new storm sewer, September 1938
Laying
pipe along Battle Creek River, 1936
Dredge
and pile driver used to lay pipe under Battle Creek River, 1936
Laying
conduit in bed of Battle Creek River near old Hart Mill, 1936
Laying
30 inch pipe under Battle Creek River, Monroe to Elm Street, 1936
Hydraulic
ram which forces spring water to farms near Beadle Lake
Divers
laying 30 inch pipe under Battle Creek River, 1936
New
pump stations, Verona, 1938-39
Main
pumping station, Verona, 1938-39
New
water supply system, Verona, 1938-39
Electric
pump house, 1938-39
|